Demonstration 2Date: October 13, 2012 In Attendance:
PreparationThe VideoRay ROV pre-dive checklist was completed and the UT gauge was calibrated and prepared for operation according to manufacturer's specifications. All systems passed the checks. Demonstration ExecutionThe ABS Surveyor did witness a verification of calibration when the demonstration was complete. The UT gauge was within tolerance. Corresponding Video Footage Sample Images Measurement being taken on a floor section of the tank within close proximity to a side wall. The VideoRay articulating arm allows the gauge to be used in all orientations from vertical up through vertical down and in close quarters.Measurement of a structural rib at Frame 228 on the inverted curved surface of the flange. Preparing to take a measurement close to a structural rib. The demonstration started in the lower portions of Fore Peak Tank 101 in the areas that are accessed by man hole only. The ABS inspector inquired if the UT measurements could be taken on the curved and inclined surfaces and in the confined spaces. These tasks were completed successfully. The first portion of the demonstration confirmed:
The Demonstration proceeded to the top open portion of Fore Peak Tank 101. The Second portion of the demonstration confirmed:
GapsNo additional gaps identified |
|